Showing posts with label Calender. Show all posts
Showing posts with label Calender. Show all posts

Monday, November 12, 2007

Calendar MP3

Shaylynn Devin
Period 7/8
MP3 Calendar

February 4-8
4. Finish Calendar for third marking period. Hand in at end of class.
5. Calendar due. Start Correcting Midterm reports.
6. Finish correcting Midterm Reports and send to mentors and teachers.
7. Help Andrew with the construction of the Lexon pieces.
8. Help Andrew with the construction of the Lexon pieces
February 11-15
11. Bring in laptop and begin tutorials for the Microsoft Robotics Program.
12. Continue taking tutorials on how to program Xbox controller both at home and at school.
13. Have conference call with mentors to have them help with programming Xbox controller.
14. Begin programming Xbox controller.
15. Finish programming controller
February 19-22
19. Start construction on PVC housing.
20. Cut pieces of plastic for inside shelves in PVC housing. Drill holes into plastic randomly.
21. Start work on press release.
22. Continue work on press release.
February 25-29
25. Receive the components ordered
26. Start to wire components starting at the battery and working towards components.
27. Continue work on wiring from wire blocks heading towards the motor controllers.
28. Continue work on wiring from laptop to USB Hub.
29. Continue work on wiring from USB Hubs to motor controllers. When finished with all wires, make sure electrical connections work.
March 3-7
3. Start soldering all connections between wires.
4. Finish soldering all connections.
5. Use silicon spray to water proof all components.
6. Finish waterproofing all components.
7. Begin to mount all components onto plastic pieces.
March 10-14
10. Continue to mount all components to plastic pieces.
11. Finish mounting all components to plastic pieces.
12. Mount plastic pieces in the PVC housing.
13. Waterproof one end of housing and fill bottom with silica gel desiccants.
14. Make sure PVC housing is watertight and all connections are working.
March 17-20
17. Continue working on press release.
18. Continue working on press release. First pool day.
19. Finish press release and hand in to teachers.
20. Annual Inspection
March 31-4
31. Start working make sure all connections are working and the buoyancy is correct.
1. Start and finish on Log entries.
2. Start and finish mentor contacts. Pool day
3. Presentations start
4. Presentations. Pool day
April 7-10
7. Presentations
8. Fix whatever was wrong from the last pool day. Pool day
9. Continue to work on testing procedures in the lab and also things that have been going wrong at the pool.
10. Work on things on the ROV to make sure it is in working order for the competition. Pool day

Calendar MP2

November
15
Participation/ Schedule/ Calendar Due
16
Contact mentor to talk about project and Developmental work
Update blog
19
Research more for developmental work
20
Work on orthographic drawings for developmental work
Update blog
21
Work on orthographic drawings for developmental work
22
No School
23
No School
26
Work on orthographic drawings for developmental work
27
Finish working on orthographic drawings. Start exploded isometric drawings Update Blog
28
continue to work on exploded isometric drawings
29
continue to work on exploded isometric drawings
30
finish working on exploded isometric drawings Update Blog

December
3
start work on rendered isometric
4
continue work on rendered isometric Update Blog
5
continue work on rendered isometric
6
continue work on rendered isometric
7
finish rendered isometric Update Blog
10
Start Plan of Procedures with supply list
11
Finish supply list and start materials list. Update Blog
12
finish materials list
13
start parts list.
14
finish parts list. Finish up plan of procedure. Update Blog
17
Put all developmental work together and make sure it is done completely
18
make sure all developmental work in complete and hand in. Update Blog
19
Developmental Work and Process Due
20
start work on math and science analysis
21
continue work on math and science analysis. Update Blog
24
No School
25
No School
26
No School
27
No School
28
No School
31
No School

January
1
No School
2
collect images and finish introduction for math and science analysis
3
label and images etc., describe all concepts that apply to the project.
4
make illustrations for all of the concepts and start work on the mathematical computations for project. Update Blog
7
Finish mathematical computations for project.
8
Describe the technology involved in project and make a conclusion for math and science analysis. Update Blog
9
make sure all of the math and science analysis is completed and turn in.
10
Math and Science Analysis Due
11
start making outline for presentations
14
finish outline for presentations
15
make sure blog looks good for presentation and make sure all the pages and pictures work
update blog
16
practice presentations
17
Formal Progress Update Presentations Start
18
presentations
21
presentations
22
presentations
23
Log Sheet/ Mentor Contacts Due

Wednesday, September 19, 2007

Calender MP1



































September


Monday


Tuesday


Wednesday


Thursday


Friday




























20


Put calendar onto blog


21


Put all summer work onto blog


Update blog


24


Do more research for brainstorming (type of control, size, shape)


25


Work on isometric drawings for alternate solutions


Update blog


26


Finish isometric drawings and start working on 3d drawings


27


Finish 3d drawings



28


Make sure everything for presentation is finished


Update blog











































October


Monday


Tuesday


Wednesday


Thursday


Friday


1


Make outline for presentation


2


Practice presentation make sure it’s between 4 and a half and 5 minutes


Update blog


3


presentations


4


presentations


5


presentations


8


Begin working on selection rejection report


9


Pros/cons of first solution


Update blog


10


Pros/cons of second solution


11


Pros/cons of third solution


12


Finalize selection rejection report


Update blog


15


Get materials for model


16


Work on model in tech lab


Update blog


17


Work on model in tech lab


18


Work on model in tech lab


19


Work on mode in tech lab


Update blog


22


Work on model in CAD


23


Work on Model in CAD


Update blog


24


Work on model in CAD



25


Work on model in CAD


26


Finish model


Update blog


29


Make outline for formal presentation


30


Put all material onto blog



31


Practice presentation











































November


Monday


Tuesday


Wednesday


Thursday


Friday








1


presentations


2


presentations


5


presentations


6


Start working on calendar for MP2


7


Finish calendar for MP2


8


Start the developmental work


9


Continue working on developmental work


Update blog


12


Keep working on developmental work


13


Update blog